Now, let’s consider the inefficiencies that this type of lube task planning and scheduling creates. Of the eight-hour workday, how many hours is our tech actually doing value-added work, as opposed to collecting supplies, paperwork or traveling to/from the job sites?
In the maintenance and reliability field, the time spent doing work as opposed to every other aspect of planning, kitting and traveling to the job is called “wrench time”rubber conveyor belts. For many organizations, wrench time barely exceeds 25 to 30 percent, meaning that out of an eight-hour day, on
Now, let’s think about the execution of the lube tasks prescribed for our belt conveyor. The actual time to grease the motor or pillow block bearings, take an oil sample or check the timing belts oil level is miniscule compared to the time to obtain the PM worksheets, gather the required tools and walk to the lubrication point in question. For all but the smallest plant, this is always true – the bulk of the time is not spent executing value-added lubrication tasks but in preparing to execute the tasks.
OK, how can we be more efficient in the way we plan, schedule and execute work? The answer is actually very simple: Forget about task frequency! That’s not to say that we shouldn’t adhere to the optimum periodicity for lubrication PMs, but rather we should not consider the frequency in compiling the block of work to be done in any given work day or week.
This approach, called “dynamic route planning”PU Timing belt, allows for any task that is geographically related or requires the same or similar tool set to be executed on the same assignment sheet. While this takes some time to establish, deploying dynamic route management really creates far more efficiency in kitting and traveling to the job site.
Using this approach for our belt conveyor, we find that, on
On
Time Well Spent
Using this simple example, it should be apparent that dynamic route planning offers a very significant advantage over our conventional approach of frequency-based lube routes. Instead of walking to and from the lube room, locating and gathering different tools, and handling paperwork Standard sphygmomanometer before executing the work, dynamic route planning allows those tasks that logically fit together to be done at the same time, no matter what their prescribed frequency.
So, next time you look at how you execute routine time-based PM work, think about where most of the time is spent: Is it in actually doing valued-added work shanghai escort, or are you spending most of your days preparing to do work?