Product introduction:
A brand Ⅰ HD template paint - with the concrete bridge, the coating tuomoji, coating on the template in hard. Anticorrosion coating, can a 4-6 times, stripping pouring out of the concrete and a copy marble, smooth, feel is exquisite, luster, and concrete consistent color, achieve as-cast-finish concrete effect, it is current tuomoji inaccessible. Especially suitable for the construction of concrete appearance strict. Widely applied YuJianQiao, beams, prefabricated plant etc. High quality is the bridge engineering will choose release agents.
1, the main performance
(1) the drying time (hours) 25 degrees Celsius, ﹤ table dry ﹤ work 8 hours, 24 hour,
(2) turn load resistance (500) ﹤ 3mg 500g
(3) heat saturated Ca (OH) 2 80 ° c p, no blister, 120h off
(4) resistant to salt water (3) p NaCl 1 months, not rust
2, the use method
(1), use material must be dry before to remove dust removing rust), (such as oil (wax), in order to improve the cohesion of the paint material.
(2) the paint coating, coating evenly shoulds not be too thick, no leakage flow phenomena, dosage brush hang for 25 square meters/kg commonly.
(3) the paint brush in the template, general 20-30 minutes, surface smooth table dry, hard to avoid the dust pollution (this is currently some product can achieve)
(4) to film after action (24 hours) before pouring concrete.
(5) for the first time after stripping of template simple cleaning can be used again and demoulding.
(6) : 3-6 times after stripping off again, film cannot meet stripping away under the condition of the old paint, coating, can again, removal of old paint can be used for Angle by grinding machine factory facilities or paint agent (special paint removers, 5-10 minutes and rinse, paint act of riddance went clean, dry it to besmear brushs)
3, notices
(1) the paint containers with water and acid, avoid alcohol contact, lest solidification.
(2) the lacquer sealed to prevent ooze water to save, and leakage, used paint with unused, lest the merger is qualitative.
(3) the table before the dry film shall rain shower.
(4) valid for 1 year.
Keywords: this template lacquer paint on the project of the template, using the method of product application demoulding